The University of California, Berkeley retained the services of Watry Design to prepare bridging documents for design/build bids for a parking structure at the site of the demolished Underhill Parking Structure, bounded by College Avenue to the east, Channing Way to the north and Haste Street to the south. The west side of the site is bounded by the Centralized Dining facility |
| |
|
| |
The site for the proposed parking structure was previously occupied by a concrete parking structure with one level of on-grade parking, one elevated deck of parking and one elevated deck for an athletic field. Channing Way and Haste Street slope up from west to east and College Avenue is approximately 25’ above the finished grade of the site. The old parking structure was demolished in 1993 and the site is currently being used as an on grade parking lot for approximately 250 cars. |
| |
|
| |
The program for the replacement structure is 1,000 stalls with a multipurpose field on top. The field level must be at the level of College Avenue. Entries to the parking structure will be from Channing Way and Haste Street at different levels |
| |
|
| |
Project Data: |
| |
|
| |
|
|
| |
|
| |
 |
| |
|
| |
 |
| |
 |
 |
| |
|
| Owner: |
University of California, Berkeley |
| Contractor: |
C. Overaa & Company |
| Status: |
In Construction |
| Watry: |
Executive Architect, Structural |
| |
Engineers, and Parking Planners |
| |
|
|
|